QUIZ
For full functionality of this site it is necessary to enable JavaScript.
Submitting ...
WELL CONTRACTORS CERTIFICATION RULES
adac22d2-62e6-47ea-b773-23caf13555c3
The certified record of completion or abandonment shall be submitted within a period of ____days after completion or abandonment
10
20
30
60
When abandoning a well constructed in consolidated rock formations or that penetrate zones of consolidated rock may be filled with:
Styrofoam
Grout, sand or gravel
Drill cuttings
B & C
All of the above
Requirements for valves and casing on artesian wells is
Complete shut off
More than one valve
Pipe cap
None of the above
What must take place when a well is temporarily abandoned
Seal off well
Cap the well
Both A & B
None of the above
When an unconsolidated form is used for a well and it must be abandoned how should grout be introduced into the well to ensure proper fill:
Gravity fed through the opening
Using water to increase flow of grout
Introduce grout through a pipe extending to the bottom of the well that can be raised as the well is filled
None of the above
Answered
0
of
17
(
0
%)
Save
Next Page »
Next Page »
Powered by FlexiQuiz.
The time limit has expired and your responses have been submitted.
×
Close