WELL CONTRACTORS CERTIFICATION RULES
b641d976-e85e-4a38-b464-b6d75d97fa05
When an unconsolidated form is used for a well and it must be abandoned how should grout be introduced into the well to ensure proper fill:
Gravity fed through the opening
Using water to increase flow of grout
Introduce grout through a pipe extending to the bottom of the well that can be raised as the well is filled
None of the above
Within ____ days after a Certificate of Completion has bee issued for a well a water sampling test shall be obtained
30
5
10
90
The well owner is responsible for permanent abandonment of a well except when:
well contractor is responsible for well abandonment if abandonment is required because the well contractor improperly locates, constructs, repairs or completes the well
the person who installs, repairs or removes the well pump is responsible for well abandonment if that abandonment is required because of improper well pump installation, repair or removal
the well contractor (or individual) who conducts a test boring is responsible for its abandonment at the time the test boring is completed
All of the above
What must take place when a well is temporarily abandoned
Seal off well
Cap the well
Both A & B
None of the above
When abandoning a well constructed in consolidated rock formations or that penetrate zones of consolidated rock may be filled with:
Styrofoam
Grout, sand or gravel
Drill cuttings
B & C
All of the above