QUIZ
For full functionality of this site it is necessary to enable JavaScript.
Submitting ...
WELL CONTRACTORS CERTIFICATION RULES
ec98a286-9b94-4aed-94d0-5bf3db91498e
Requirements for valves and casing on artesian wells is
Complete shut off
More than one valve
Pipe cap
None of the above
Injection wells must be abandoned and/or brought into compliance within _____ days after notification of non compliance
10
14
30
60
When abandoning a well constructed in consolidated rock formations or that penetrate zones of consolidated rock may be filled with:
Styrofoam
Grout, sand or gravel
Drill cuttings
B & C
All of the above
The well owner is responsible for permanent abandonment of a well except when:
well contractor is responsible for well abandonment if abandonment is required because the well contractor improperly locates, constructs, repairs or completes the well
the person who installs, repairs or removes the well pump is responsible for well abandonment if that abandonment is required because of improper well pump installation, repair or removal
the well contractor (or individual) who conducts a test boring is responsible for its abandonment at the time the test boring is completed
All of the above
All wells shall be permanently abandoned when:
Casing has not been installed prior to removing drill equipment
Casing has been removed prior to removing drill equipment
Contractor improperly installs the well
All of the above
Answered
0
of
17
(
0
%)
Save
Next Page »
Next Page »
Powered by FlexiQuiz.
The time limit has expired and your responses have been submitted.
×
Close