QUIZ
For full functionality of this site it is necessary to enable JavaScript.
Submitting ...
WELL CONTRACTORS CERTIFICATION WELL DEVELOPMENT QUIZ
734d452a-db67-4d83-83d3-8693720f2598
What are the instances where disinfection of a well should take place
After construction
After repair
Opening any part of the system
All of the above
What are two ways that water comes from spring
Gravity
Lead
Artesian pressure
Both A & C
Information that can be obtained from a chemical analysis of the water
Presence of harmful subtances
Water corrosivity potential
Water staining potenail
All of the above
A water supply well shall be equipped with an access port with a minimum diameter of ____
1in
2ft
2in
It's not required.
A private drinking water well may not be placed into service until a Certificate of ________ is issued by the Department
Removal
Finish
Completion
None of the above
Answered
0
of
44
(
0
%)
Save
Next Page »
Next Page »
Powered by FlexiQuiz.
The time limit has expired and your responses have been submitted.
×
Close