When the water level is being measured (ft) during drawdown on a well the difference measured is between what two levels?
The level at which water stands in a well when pumping is in progress is called:
When calculating specific capacity on a well, if the pumping rate is 200 gpm (gallons per minute) and the drawdown is 40ft what is the specific capacity?
The part of the total volume when water is released from a material is called it’s ____________
The following terms can be applied to well screen(s)
Answered 0 of 13 (0%)
Save
Next Page »