WELL CONTRACTORS CERTIFICATION CONSTRUCTION STANDARDS QUIZ1
6b75fe4f-654a-4bfd-9fdb-064a24e464d3
When a well is used for dewatering, what is the required time frame the well must be permanently abandoned once dewatering has finished
5 days or less
10 days or less
30 days or less
60 days or less
What is NOT required when using pitless adapters or units as a method of well head completion:
Top of the unit extends at least 12 in above the land surface
Compatible with the well casing
Casing and pitless device is filled with grout from the top of the casing grout to the land surface
An access port is not required
If there is a concern of boulders at a certain site, it may be better to drill an _________
Test well
Exploratory hole
Excavation site
None of the above
Groundwater is the water that fills the fractures, pore spaces and other openings in soil and rock formations
True
False
The base plate of a pump placed directly over the well shall be designed to form a watertight seal with:
Well casing
Pump foundation
A or B
None of the above