WELL CONTRACTORS CERTIFICATION CONSTRUCTION STANDARDS QUIZ1
9671a9fc-3a75-4651-a167-1b4c41425e66
Vertical seepage can occur readily outside when ______ is left unsealed in the ground near the surface
Borehole
Casing
Creviced rock
Wellhead
The pump installation plate information shall have the following information:
Date the pump was installed
Depth of the pump intake
Horsepower rating of the pump
All of the above
What are the most important things when choosing material for a screen:
Mineral content of the water
Presence of bacterial slimes
Strength requirements of the screen
All of the above
When a well is used for dewatering, what is the required time frame the well must be permanently abandoned once dewatering has finished
5 days or less
10 days or less
30 days or less
60 days or less
The base plate of a pump placed directly over the well shall be designed to form a watertight seal with:
Well casing
Pump foundation
A or B
None of the above