QUIZ
For full functionality of this site it is necessary to enable JavaScript.
Submitting ...
WELL CONTRACTORS CERTIFICATION CONSTRUCTION STANDARDS QUIZ1
df97bbab-a5e3-44d0-8d67-57736a70e78f
The entire depth of the well shall be sounded before it is sealed to ensure freedom from obstructions that may interfere with sealing operations
True
False
A setback of a minimum of ______ ft is required for a well from a septic tank, drainfield and drainfield repair area
25ft
100ft
50ft
75ft
In order to assure that grout will provide a complete seal it should be placed________
Filled at various times when convenient
Filled with all types of grout
One continuous operation
None of the above
The diameter of the well casing should be _____ sizes larger than the nominal diameter of the pump
2
3
4
10
What is the typical drying time for Portland cement?
24 hrs
12 hrs
36 hrs
72 hrs
Answered
0
of
35
(
0
%)
Save
Next Page »
Next Page »
Powered by FlexiQuiz.
The time limit has expired and your responses have been submitted.
×
Close