QUIZ
For full functionality of this site it is necessary to enable JavaScript.
Submitting ...
WELL CONTRACTORS CERTIFICATION CONSTRUCTION STANDARDS QUIZ1
ecedfd77-e079-4c8e-99d2-616c8e7aaa2d
Vertical seepage can occur readily outside when ______ is left unsealed in the ground near the surface
Borehole
Casing
Creviced rock
Wellhead
What tools can be used to develop a well with effective means of surging the water
Surge plunger
Surge block
Heavy bailer
All of the above
A necessary final step in well completion is __________ to eliminate bacteria
Washing
Disinfecting
Sanitizing
None of the above
The size of the grout space to be provided when drilling the well usually depends upon the method of _________
Drilling
Boring
Mixing
Grouting
When might spacing between wells in well point system be less than 25ft
Large boulders in soil
Fine sand formations
Excess tree roots
None of the above
Answered
0
of
35
(
0
%)
Save
Next Page »
Next Page »
Powered by FlexiQuiz.
The time limit has expired and your responses have been submitted.
×
Close