WELL CONTRACTORS CERTIFICATION CONSTRUCTION STANDARDS QUIZ1
8deb3cab-884e-46e3-a315-52023cf68aa1
The well contractor identification plate is required to be installed within ______ hours after drilling is complete:
24
36
48
72
A certified well contractor of the appropriate level is not required on site for all activities
True
False
What are important points for gravel packing:
Method that does not separate materials
Uniform grade of gravel pack
Sizing that similar within 2
All of the above
What type of water must be used to prime the pump:
Potable water
Non potable water
Ditch water
Rainwater
When removing wells screens of 16 inch diameter or larger a _______ is used at the lower end of the pulling pipe instead rather than sacking
Fork
Spear
Steel disk
End pipe