1. Select best definition for Output.
2. The component or system to be tested can be best named as:
3. A portion of the value domain of a data element related to the test object for which all values are expected to be treated the same based on the specification can be best named as: (multiple choice is required)
4. Project risk can be best described as:
6. Select best name for definition. Testing an integrated system to verify that it meets specified requirements.
7. Non-functional requirement can be best described as:
8. Functionality (functional suitability) can be best described as:
9. Select best name for definition. A document describing the approach, resources and schedule of intended review activities. It identifies, amongst others: documents and code to be reviewed, review types to be used, participants, as well as entry and exit criteria to be applied in case of formal reviews, and the rationale for their choice. It is a record of the review planning
10. The degree to which a component or system can be used by people with the widest range of characteristics and capabilities to achieve a specified goal in a specified context of use can be best named as:
11. Select best names for definition (multiple choice is required). A black-box test technique using a state transition diagram or state table to derive test cases to evaluate whether the test item successfully executes valid transitions and blocks invalid transitions.
12. Select best name for definition. Testing a work product without code being executed.
13. The process of finding, analyzing and removing the causes of failures in software can be best named as:
14. Quality characteristic can be also named as: (multiple option is required)
15. Select best name for definition. The planning, scheduling, estimating, monitoring, reporting, control and completion of test activities
16. Performance efficiency can be also named as: (select two answers)
17. Select best name for definition. Multiple choice is required. On large projects, the person who reports to the test manager and is responsible for project management of a particular test level or a particular set of testing activities.
18. Select best name for definition. The effect on the component or system by the measurement instrument when the component or system is being measured, e.g., by a performance testing tool or monitor. For example performance may be slightly worse when performance testing tools are being used.
19. A logical expression that can be evaluated as True or False, e.g., A>B can be best named as: (select two answers)
20. Master test plan can be best described as:
21. Session-based testing can be best described as:
22. Functional requirement can be best described as:
23. Failure can be best described as:
24. The activity of deriving and specifying test cases from test conditions can be best named as:
25. Select best name for definition. An element of storage in a computer that is accessible by a software program by referring to it by a name.
26. Independence of testing can be best described as:
27. Result can be best described as:
29. Coverage tool can be best described as:
30. Non-functional testing can be best described as:
31. Re-testing can be best described as:
32. Select best name for definition. The organizational artifacts needed to perform testing, consisting of test environments, test tools, office environment and procedures.
33. Operational environment can be best described as:
34. Select best names for definition (multiple choice is required). A software engineering methodology used within Agile software development whereby core practices are programming in pairs, doing extensive code review, unit testing of all code, and simplicity and clarity in code
35. A form of review that follows a defined process with a formally documented output can be best named as:
36. Documentation of the occurrence, nature, and status of an incident can be best named as:
37. A test tool that generates load for a designated test item and that measures and records its performance during test execution can be best named as:
38. Control flow can be best described as:
39. System under test (SUT) can be best described as:
40. Robustness can be best described as: